NO. | Equipment | Unit | Qty. | Remark |
1 | Φ400 cogging mill unit | |||
1.1 | Three-roll rolling mill housing | set | 1 | |
1.2 | Three-axis gearbox | set | 1 | |
1.3 | Universal joint | pcs | 3 | |
1.5 | Reducer | set | 1 | |
1.6 | Roller | pcs | 3 | |
1.7 | Bearing | pcs | 6 | |
1.8 | Bearing box | set | 6 | |
1.9 | Bracket,Rolling mill,Gear box,Motor base, coupling |
set | 1 | |
2 | Φ320 one-driven-two rolling mill | set | 6 | |
2.1 | Rolling mill housing | set | 6 | |
2.2 | Gearbox | set | 6 | |
2.3 | Universal joint | pcs | 12 | |
2.4 | Reducer | set | 1 | |
2.5 | Roller | pcs | 12 | |
2.6 | Bearing | pcs | 48 | |
2.7 | Bearing box | set | 24 | |
2.8 | Rolling mill, gear box,motor base,coupling | set | 6 | |
3 | Φ300 one-driven-two rolling mill | set | 3 | |
3.1 | Rolling mill housing | set | 6 | |
3.2 | Gearbox | set | 6 | |
3.3 | Universal joint | pcs | 12 | |
3.4 | Compound reducer | set | 3 | |
3.5 | Roller | pcs | 12 | |
3.6 | Bearing | pcs | 48 | |
3.7 | Bearing box | set | 24 | |
3.8 | Rolling mill, gear box,motor base,coupling | set | 3 | |
4 | Step cooling bed 52×6.5m | set | 1 | |
5 | Chain type cooling bed 52×5m | set | 1 | |
6 | Roller table | |||
6.1 | Feeding roller table,Charging roller table | set | 3 | |
6.2 | Front cogging mill with roller table | set | 2 | |
6.3 | Lifting table and Extension roller table | set | 1 | |
6.4 | The cantilever roller table | set | 3 | |
6.5 | Front mill roller table of continuous rolling section | set | 1 | |
6.6 | Output roller table of cooling bed | set | 10 | |
6.7 | Cut-to-length roller table | set | 5 | |
7 | Accessory equipment | |||
7.1 | Multi-lengths flying shear | set | 1 | |
7.2 | Pinch roll | set | 2 | |
7.3 | Cut-to-length shear | set | 1 | |
7.4 | Emergency flying shear | set | 1 | |
7.5 | Collection chain + packing table | set | 1 | |
7.6 | Fixed saw | set | 9 | |
8 | Supply System | |||
8.1 | Cooling tower and cooling water pipeline | set | 1 | |
8.2 | Thin-oil Lubrication Station & Pipeline | set | 2 | |
8.3 | Air Compressor & Pipeline | set | 1 | |
8.4 | Automatic electronic control device | set | supplementary equipment | |
8.5 | Transformer | set | supplementary equipment | |
9 | Heating Furnace | |||
9.1 | Pusher | set | ||
9.2 | Tapping machine | set | ||
9.3 | Heat exchanger | set | ||
9.4 | Furnace delivery table | set | ||
9.5 | Blower | set | ||
9.6 | Burner | set | ||
10 | Motor | |||
10.1 | 800KW(Roughing mill) | set | ||
10.2 | 450KW(DC) | set | ||
10.3 | 380KW(AC) | set | ||
10.4 | Starting cabinet | set | ||
10.5 | Transformer | set | ||
10.6 | 3150KVA(660V) | set | ||
10.7 | 1000KVA(6000V) | set | ||
10.8 | 1500KVA(400V) | set | ||
10.9 | 1000KVA(400V) | set | ||
Remark: Workers required for the production line: 13 workers Production water consumption: 35kg / hour Natural gas consumption: 38m³/ton Fuel consumption: 43kg / ton Consumables (bearings, rolls, wearing parts): ¥35.00 / ton Electricity consumption: 110 degrees / ton Concrete usage: about 2000m³ |
Before sale: design the suitable machine based on the specific demands
Medium sale:
1.Based on customer's demand to offer moderate quotation project 2.Accept customers to visit our factory
3.Help customer work out the schedule in china
After-sale:
1.On-site training personnel 2.Appoint special aftersale service staff, arrived at the scene guide clients
installation and commission